• About
    • Leadership Team
    • Board of Trustees
    • Meeting Minutes & Schedule
    • Awards
    • Policies, Procedures & Principles
    • Annual Reports
    • 2019 Media Kit
    • Logo/ Branding Policy
  • Community
    • Bill Paying Assistance
    • Scholarships
    • Employment
    • Safety
    • KCEF Community Project Application
  • News
  • Contact Us
  • Pay Online
    • Pay Electric
    • Pay Internet
    • Pay Propane
  • Monthly Newsletter
  • en
    • en
    • es
  • Kit Carson Electric
  • Kit Carson Internet
  • Kit Carson Propane
Kit Carson Electric Cooperative
  • Pay Your Electric Bill
  • Electric Info
    • Mobile App
    • Forms
    • Rates
    • EV Vehicles
    • Services
    • Clean Hydrogen Energy Production in Questa
    • Microgrid Project
    • E-Billing – Go Green
    • Products
    • Pay Your Electric Bill
    • Tree Trimming and Cleaning
    • Renewable Taos
    • NMPRC
    • E-Billing Signup
  • Solar
    • 100% Daytime Solar Energy by 2022
    • Solar Generation & Usage
    • KCEC’s Solar Production
    • Net-Metering
    • Renewable Taos
  • New Service
Electric Info > Net-Metering
    • Pay Your Electric Bill
    • Electric Info
      • Mobile App
      • Forms
      • Rates
      • EV Vehicles
      • Services
      • Clean Hydrogen Energy Production in Questa
      • Microgrid Project
      • E-Billing – Go Green
      • Products
      • Pay Your Electric Bill
      • Tree Trimming and Cleaning
      • Renewable Taos
      • NMPRC
      • E-Billing Signup
    • Solar
      • 100% Daytime Solar Energy by 2022
      • Solar Generation & Usage
      • KCEC’s Solar Production
      • Net-Metering
      • Renewable Taos
    • New Service

Net-Metering

Please fill out the Solar Net -Metering Pre-Screening application form and submit for approval, prior to submitting an interconnection application. Thank you
Solar Net-Metering Pre-Screening Application:
  • Solar Net-Metering Pre-Screening Online Application
  • Solar Net-Metering Pre-Screening PDF Version Application

Thank you for your interest in Net Metering. Our goal is to provide you with accessible information to make your interconnection as streamlined as possible. This page provides several links for the documents you will need to get started.

Two of the documents are:
  • NMPRC Rule 568
  • NM Interconnection Manual 2008

The interconnection manual includes the Simplified Interconnection Application on page 24, which will be the application required for interconnecting with our distribution system for most residential customers.

Another document is the New Mexico PRC rule 570, which describes the credit you would receive should you generate more power than you consume over a given billing period. This credit would be equal to KCE’s avoided cost, which is filed in January of every year with the PRC.

Prior to interconnection, you should have all required paperwork and applications submitted. We will also need to inspect your installation, possibly change your meter, and have written approval from the state electrical inspector. Please contact us at (575)-758-2258 and let the operator know you are calling about Net Metering if you have any other questions or if you need more information.

Download the Distributed Generation and Net Metering Documents:

If you are interested in Net Metering Agreement greater than 25kW Email Richard Martinez at rmartinez@kitcarson.com

Net Metering Application up to 10 kW

Net Metering Application Greater Than 10kW

Contact Us:
Kit Carson Electric

Phone: (575) 758-2258
118 Cruz Alta Road • Taos, NM 87571

Kit Carson Internet

Phone: (575) 758-4838
116 Cruz Alta Rd • Taos, NM 87571

Kit Carson Propane

Phone: (575) 758-7757
201A Cruz Alta Rd • Taos, NM 87571

Quick Links
  • Kit Carson Electric
  • Kit Carson Internet
  • Kit Carson Propane
  • News
  • Pay Online
  • About Us
  • Board of Trustees
  • Policies, Procedures & Principles
  • Employment
  • Contact Us
Stay Connected

Copyright 2025, Kit Carson Electric Cooperative is an equal opportunity provider and employer.